Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Sumner Dam Spillway Bridge Realignment Project

United States · Transport and logistics

In-depth research Release 1

Project scope

Plan: A proposal to construct a new bridge over the Pecos River just downstream of Sumner Dam and realign NM 203 traffic away from the dam crest and spillway bridge. The source says studies concluded that using the existing alignment for a new bridge was not feasible; it does not report construction of the proposed bridge.

Reported status and procurement

Reported development

The Federal Highway Administration, in coordination with Reclamation, secured a Federal Lands Transportation Program grant to develop a realignment. Reclamation reported working with project partners on design and seeking additional construction funding through the Bridge Investment Program.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

The Sumner Dam Spillway Bridge Realignment Project proposes a new bridge over the Pecos River downstream of Sumner Dam to reroute NM 203 traffic away from the dam crest and spillway bridge. This is distinct from the radial-gates replacement project.

In its March 2025 announcement, Reclamation reported that a Federal Lands Transportation Program grant had been secured for developing the realignment, but that Bridge Investment Program funding was not granted in January 2025. The announcement reported the project paused pending alternative funding, likely cost-shared. These are reported developments from that announcement, not a current status update.

Evidence limits and unknowns

The March 2025 announcement does not establish whether alternative funding has since been committed or whether the project has resumed. It also does not identify a final design, construction contractor, or construction schedule.

Investment and financing

Reported total investment

A Federal Lands Transportation Program grant was secured for developing the realignment. In January 2025, Bridge Investment Program funding for the project was not granted because of project ineligibility stemming from the extent of the realignment; the source says this made that funding unavailable.

Financing report and participants

The project was reported paused pending commitment of alternative funding sources, described as likely cost-shared. The source does not say the project was canceled.

Total investment and financing amount are different measures. Currency notation is retained as reported; no conversion or current funding availability is verified.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United States
Based on reviewed release evidence
Region
North America
Category
Transport and logistics
Derived from released evidence
Physical assets
Road

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Sumner Dam Spillway Bridge Realignment Project

Attributed to US Bureau of Reclamation screened government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-01

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-01

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation screened government project narrative

Technical record · Sumner Dam Spillway Bridge Realignment Project
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
89feed93-bb0f-41f5-acd0-eae5fbefbfdb
Evidence reference
27e193f5-59b3-46fd-afbe-022b93ce1428
Source revision
2c2f0c60-4f4f-4265-82fb-ffaceaa58b79
Content fingerprint
3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28
Source address
https://www.usbr.gov/uc/progact/sumner/index.html

Scope

Planned

A proposal to construct a new bridge over the Pecos River just downstream of Sumner Dam and realign NM 203 traffic away from the dam crest and spillway bridge. The source says studies concluded that using the existing alignment for a new bridge was not feasible; it does not report construction of the proposed bridge.

Attributed to US Bureau of Reclamation screened government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-01

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-01

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation screened government project narrative

Technical record · A proposal to construct a new bridge over …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
8a6a6f9c-4163-4741-a9af-6438decd5d01
Evidence reference
d153bf9a-83a5-49b6-9893-e6d958e60b61
Source revision
2c2f0c60-4f4f-4265-82fb-ffaceaa58b79
Content fingerprint
3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28
Source address
https://www.usbr.gov/uc/progact/sumner/index.html

Current activity

Source reported

The Federal Highway Administration, in coordination with Reclamation, secured a Federal Lands Transportation Program grant to develop a realignment. Reclamation reported working with project partners on design and seeking additional construction funding through the Bridge Investment Program.

Attributed to US Bureau of Reclamation screened government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-01

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-01

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation screened government project narrative

Technical record · The Federal Highway Administration, in coordination with Reclamation, …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
972b019e-d28c-459a-aae1-ef661db4d46b
Evidence reference
44760a2b-90cb-4fff-8dd0-c5dcb8a4745a
Source revision
2c2f0c60-4f4f-4265-82fb-ffaceaa58b79
Content fingerprint
3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28
Source address
https://www.usbr.gov/uc/progact/sumner/index.html

Location

Source reported

Over the Pecos River just downstream of Sumner Dam; the proposed realignment concerns NM 203.

Attributed to US Bureau of Reclamation screened government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-01

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-01

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation screened government project narrative

Technical record · Over the Pecos River just downstream of Sumner …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e2fd5cec-0c61-4a30-a116-8a39cb66f4a2
Evidence reference
bc437b1e-c5f8-44ab-9ae2-39ce6f1a6fe5
Source revision
2c2f0c60-4f4f-4265-82fb-ffaceaa58b79
Content fingerprint
3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28
Source address
https://www.usbr.gov/uc/progact/sumner/index.html

Investment estimate

Source reported

A Federal Lands Transportation Program grant was secured for developing the realignment. In January 2025, Bridge Investment Program funding for the project was not granted because of project ineligibility stemming from the extent of the realignment; the source says this made that funding unavailable.

Attributed to US Bureau of Reclamation screened government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-01

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-01

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation screened government project narrative

Technical record · A Federal Lands Transportation Program grant was secured …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
90aeb2a9-1739-4339-9672-d0c5425645ff
Evidence reference
8da94d87-98ea-4b39-8ba5-63623ec66f06
Source revision
2c2f0c60-4f4f-4265-82fb-ffaceaa58b79
Content fingerprint
3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28
Source address
https://www.usbr.gov/uc/progact/sumner/index.html

Next milestone

Unknown

Commitment of alternative funding sources is the stated condition for the project to move beyond its reported pause.

Attributed to US Bureau of Reclamation screened government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-01

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-01

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation screened government project narrative

Technical record · Commitment of alternative funding sources is the stated …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
92d464cc-dd6c-4c2e-b9fc-e78a35e0a7b6
Evidence reference
4e0cf2cd-7b3b-4580-8991-af4930a54f4d
Source revision
2c2f0c60-4f4f-4265-82fb-ffaceaa58b79
Content fingerprint
3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28
Source address
https://www.usbr.gov/uc/progact/sumner/index.html

Financing stage

Source reported

The project was reported paused pending commitment of alternative funding sources, described as likely cost-shared. The source does not say the project was canceled.

Attributed to US Bureau of Reclamation screened government project narrative.

Source: US Bureau of Reclamation screened government project narrative · publication date not recorded · observed 2026-10-01

Sources and evidence · US Bureau of Reclamation screened government project narrative
Source published: Not recordedObserved: 2026-10-01

US Bureau of Reclamation screened government project narrative
Attributed to US Bureau of Reclamation screened government project narrative

Technical record · The project was reported paused pending commitment of …
Evidence location
/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
0e1907bd-0913-4124-bed5-6c787826ddb1
Evidence reference
937c3177-7a94-4023-a53b-c792c1066d8d
Source revision
2c2f0c60-4f4f-4265-82fb-ffaceaa58b79
Content fingerprint
3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28
Source address
https://www.usbr.gov/uc/progact/sumner/index.html
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.