25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh

India · Energy

In-depth research Release 2

Project scope

Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.

Reported status and procurement

Reported development

The individual project heading labels it “Under Construction”; this is the page's reported status, not an independently verified current status.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

SECI’s Own Projects page lists a solar PV plant at Taru, Leh, Ladakh, with 25 MW AC / 50 MWp DC solar capacity and 20 MW / 50 MWh of battery storage. Its project entry labels the project “Under Construction”; that is SECI’s reported label, not independently verified current status. (SECI, “Own Projects,” Taru project entry.)

SECI includes the project on its Own Projects page, whose introduction describes the portfolio as self-owned CAPEX projects. This is SECI’s description, not independent verification of legal title. (SECI, “Own Projects,” portfolio introduction and Taru project entry.)

The SECI tender-results page identifies tender SECI/C&P/OP/11/014/2024-25 for design, engineering, supply, construction, erection, testing, commissioning and O&M of the Taru project. Its results table names M/s Prozeal Green Energy Private Limited as “Successful Bidder.” (SECI tender-results PDF, page 1, tender title and results table.)

The results table reports a total price including GST of INR 313,12,98,395.78: INR 2,26,75,81,007.94 for plant and mandatory spare parts, INR 58,32,05,227.24 for freight, design, civil and installation services, and INR 28,05,12,160.60 for O&M. The table labels the combined amount “Awarded Cost”; it is not evidence of an unpaid balance, current supplier budget or open package. (SECI tender-results PDF, page 1, results table.)

Evidence limits and unknowns

The supplied project entry does not state a construction-start or completion date. The tender-results page does not state an award date, agreement-signature date, commissioning date, or whether the contract is currently effective. (SECI, “Own Projects,” Taru project entry; SECI tender-results PDF, page 1.)

The supplied project entry and tender-results page do not establish current progress or payment status, remaining work, open supplier packages, the O&M duration or current arrangement, or a buying window. (SECI, “Own Projects,” Taru project entry; SECI tender-results PDF, page 1.)

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
India
Based on reviewed release evidence
Region
Asia
Category
Energy
Derived from released evidence
Physical assets
Battery Storage, Solar PV

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Not observed

No construction-start or completion date is stated in the project heading or description.

Attributed to Solar Energy Corporation of India Limited (externally supplied capture).

Source: Solar Energy Corporation of India Limited (externally supplied capture) · publication date not recorded · observed 2026-10-19

Sources and evidence · Solar Energy Corporation of India Limited (externally supplied capture)
Source published: Not recordedObserved: 2026-10-19

Solar Energy Corporation of India Limited (externally supplied capture)
Attributed to Solar Energy Corporation of India Limited (externally supplied capture)

Technical record · No construction-start or completion date is stated in …
Evidence location
/html/body/section[2]/div/div/div/div/div/p[16]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
b30459c6-b4da-49ca-9876-1e31216aca3d
Evidence reference
63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb
Source revision
63f7e127-0be8-4295-8a53-f4e548bbc604
Content fingerprint
430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2
Source address
https://www.seci.co.in/own-projects

Project name

Source reported

25 MW Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh, Ladakh

Attributed to Solar Energy Corporation of India Limited (externally supplied capture).

Source: Solar Energy Corporation of India Limited (externally supplied capture) · publication date not recorded · observed 2026-10-19

Sources and evidence · Solar Energy Corporation of India Limited (externally supplied capture)
Source published: Not recordedObserved: 2026-10-19

Solar Energy Corporation of India Limited (externally supplied capture)
Attributed to Solar Energy Corporation of India Limited (externally supplied capture)

Technical record · 25 MW Solar PV Power Plant (50 MWp) …
Evidence location
/html/body/section[2]/div/div/div/div/div/p[16]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
c696b563-08ed-447c-a129-7545d7a28ac0
Evidence reference
63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb
Source revision
63f7e127-0be8-4295-8a53-f4e548bbc604
Content fingerprint
430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2
Source address
https://www.seci.co.in/own-projects

Owner

Source reported

SECI presents the project on its Own Projects page within its own-project portfolio; the page describes that portfolio as self-owned projects under the CAPEX model. This is source attribution, not independent legal-title verification.

Attributed to Solar Energy Corporation of India Limited (externally supplied capture).

Source: Solar Energy Corporation of India Limited (externally supplied capture) · publication date not recorded · observed 2026-10-19

Sources and evidence · Solar Energy Corporation of India Limited (externally supplied capture)
Source published: Not recordedObserved: 2026-10-19

Solar Energy Corporation of India Limited (externally supplied capture)
Attributed to Solar Energy Corporation of India Limited (externally supplied capture)

Technical record · SECI presents the project on its Own Projects …
Evidence location
/html/body/section[1]/div/div/div/div/div/div/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
3ea6c8f0-e0df-442d-a891-0301a8f9b658
Evidence reference
27ff9771-0ad8-4b33-8bd4-e4df0b1f2c92
Source revision
63f7e127-0be8-4295-8a53-f4e548bbc604
Content fingerprint
430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2
Source address
https://www.seci.co.in/own-projects

Scope

Source reported

Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.

Attributed to Solar Energy Corporation of India Limited (externally supplied capture).

Source: Solar Energy Corporation of India Limited (externally supplied capture) · publication date not recorded · observed 2026-10-19

Sources and evidence · Solar Energy Corporation of India Limited (externally supplied capture)
Source published: Not recordedObserved: 2026-10-19

Solar Energy Corporation of India Limited (externally supplied capture)
Attributed to Solar Energy Corporation of India Limited (externally supplied capture)

Technical record · Solar PV: 25 MW AC / 50 MWp …
Evidence location
/html/body/section[2]/div/div/div/div/div/p[16]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
4a9a4533-82be-4a94-bbde-68bb5772e65e
Evidence reference
63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb
Source revision
63f7e127-0be8-4295-8a53-f4e548bbc604
Content fingerprint
430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2
Source address
https://www.seci.co.in/own-projects

Current activity

Source reported

The individual project heading labels it “Under Construction”; this is the page's reported status, not an independently verified current status.

Attributed to Solar Energy Corporation of India Limited (externally supplied capture).

Source: Solar Energy Corporation of India Limited (externally supplied capture) · publication date not recorded · observed 2026-10-19

Sources and evidence · Solar Energy Corporation of India Limited (externally supplied capture)
Source published: Not recordedObserved: 2026-10-19

Solar Energy Corporation of India Limited (externally supplied capture)
Attributed to Solar Energy Corporation of India Limited (externally supplied capture)

Technical record · The individual project heading labels it “Under Construction”; …
Evidence location
/html/body/section[2]/div/div/div/div/div/p[16]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
d148b6c0-8ae2-48ee-bb1a-486d495260f7
Evidence reference
63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb
Source revision
63f7e127-0be8-4295-8a53-f4e548bbc604
Content fingerprint
430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2
Source address
https://www.seci.co.in/own-projects

Location

Source reported

Taru, Leh, Ladakh

Attributed to Solar Energy Corporation of India Limited (externally supplied capture).

Source: Solar Energy Corporation of India Limited (externally supplied capture) · publication date not recorded · observed 2026-10-19

Sources and evidence · Solar Energy Corporation of India Limited (externally supplied capture)
Source published: Not recordedObserved: 2026-10-19

Solar Energy Corporation of India Limited (externally supplied capture)
Attributed to Solar Energy Corporation of India Limited (externally supplied capture)

Technical record · Taru, Leh, Ladakh
Evidence location
/html/body/section[2]/div/div/div/div/div/p[16]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e1f6dc78-f4d3-4484-a3a0-84463fb28bca
Evidence reference
63c55fb3-f786-4f6c-88a7-bf0c9d2ba1cb
Source revision
63f7e127-0be8-4295-8a53-f4e548bbc604
Content fingerprint
430a7fb53a9abfe2ee387f040c7867bbe6a0fc61dc3a568eeec7063e277e70a2
Source address
https://www.seci.co.in/own-projects

Source qualifications and unresolved questions

  • Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement.

Tender title: “Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 25 MW (AC) Solar PV Power Plant (50 MWp) with 20 MW/50 MWh Battery Energy Storage System at Taru, Leh.” (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf Tender No. SECI/C&P/OP/11/014/2024-25; the results table identifies M/s Prozeal Green Energy Private Limited as “Successful Bidder” for the tendered scope. (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf Under “Total Price including GST (INR)”: Schedule No. 1, “Plant and Mandatory Spare Parts” — INR 2,26,75,81,007.94; Schedule No. 2, “Freight, Design, Civil & Installation Services” — INR 58,32,05,227.24; Schedule No. 3, “Absolute Value of Operation & Maintenance” — INR 28,05,12,160.60. “Awarded Cost (SOR 1+SOR 2+SOR 3)” — INR 313,12,98,395.78. (reported). Solar Energy Corporation of India Limited (externally supplied capture), source observed 2026-10-19; https://www.seci.co.in/Upload/New/638647565126251519.pdf

Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.