Project scope
Solar PV: 25 MW AC / 50 MWp DC; battery energy storage: 20 MW / 50 MWh. The page says the project will also supply power during non-solar hours.
Reported status and procurement
- Reported development
The individual project heading labels it “Under Construction”; this is the page's reported status, not an independently verified current status.
- Procurement availability
- Unknown / not established
A source report alone does not establish current progress or an open buying window.
Project summary
SECI’s Own Projects page lists a solar PV plant at Taru, Leh, Ladakh, with 25 MW AC / 50 MWp DC solar capacity and 20 MW / 50 MWh of battery storage. Its project entry labels the project “Under Construction”; that is SECI’s reported label, not independently verified current status. (SECI, “Own Projects,” Taru project entry.)
SECI includes the project on its Own Projects page, whose introduction describes the portfolio as self-owned CAPEX projects. This is SECI’s description, not independent verification of legal title. (SECI, “Own Projects,” portfolio introduction and Taru project entry.)
The SECI tender-results page identifies tender SECI/C&P/OP/11/014/2024-25 for design, engineering, supply, construction, erection, testing, commissioning and O&M of the Taru project. Its results table names M/s Prozeal Green Energy Private Limited as “Successful Bidder.” (SECI tender-results PDF, page 1, tender title and results table.)
The results table reports a total price including GST of INR 313,12,98,395.78: INR 2,26,75,81,007.94 for plant and mandatory spare parts, INR 58,32,05,227.24 for freight, design, civil and installation services, and INR 28,05,12,160.60 for O&M. The table labels the combined amount “Awarded Cost”; it is not evidence of an unpaid balance, current supplier budget or open package. (SECI tender-results PDF, page 1, results table.)
Evidence limits and unknowns
The supplied project entry does not state a construction-start or completion date. The tender-results page does not state an award date, agreement-signature date, commissioning date, or whether the contract is currently effective. (SECI, “Own Projects,” Taru project entry; SECI tender-results PDF, page 1.)
The supplied project entry and tender-results page do not establish current progress or payment status, remaining work, open supplier packages, the O&M duration or current arrangement, or a buying window. (SECI, “Own Projects,” Taru project entry; SECI tender-results PDF, page 1.)