Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

50MW/100MWh Bouldercombe Battery Project

Australia · Energy

In-depth research Release 1

Project scope

50 MW/100 MWh large-scale battery energy storage project (BESS), built using Tesla Megapack 2.0 hardware.

Reported status and procurement

Reported development

Described as operational and in full commercial operations from 2H CY2023.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

The Bouldercombe Battery Project is a 50 MW/100 MWh battery energy storage project in Rockhampton, built using Tesla Megapack 2.0 hardware. Genex describes it as operational and reports full commercial operations from 2H CY2023.

Evidence limits and unknowns

The supplied page does not document whether a separate expansion, augmentation, replacement, or other procurement is planned, whether any supplier opportunity is open, or buying-window dates.

Project milestones

Attributed project events and plans. Source report dates and dossier release dates are separate.

  1. Project · Commercial operations began

    Reported event · date precision: half-year

    Not independently corroborated.

    This source report does not establish current progress.

    Technical record for this milestone

    Recorded event date: 2H CY2023

    Released statement reference: released-statement:activity:0:74:commercial_operations_began

    Derived from the reviewed activity statement; this is not a verbatim source quotation.

    Described as operational and in full commercial operations from 2H CY2023.

    attribution
    genexpower.com.au

    Source published not recorded · observed 2026-10-17

    Source revision: ebb39777-70e1-4bf7-8853-96086b1c261f

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Australia
Based on reviewed release evidence
Region
Oceania
Category
Energy
Derived from released evidence
Physical assets
Battery Storage

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

50MW/100MWh Bouldercombe Battery Project

Attributed to genexpower.com.au.

Source: genexpower.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · genexpower.com.au
Source published: Not recordedObserved: 2026-10-17

genexpower.com.au
Attributed to genexpower.com.au

Technical record · 50MW/100MWh Bouldercombe Battery Project
Evidence location
/html/body/div/div[1]/div[2]/div[1]/div[1]/div/div/div/div[1]/div/div/div[1]/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
2ab5ace6-1969-41d0-8369-c8105c5b80ef
Evidence reference
9fd8ccc8-1bbb-4e9d-aca1-4a95384b0804
Source revision
ebb39777-70e1-4bf7-8853-96086b1c261f
Content fingerprint
3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5
Source address
https://genexpower.com.au/bouldercombe-battery-project/

Scope

Source reported

50 MW/100 MWh large-scale battery energy storage project (BESS), built using Tesla Megapack 2.0 hardware.

Attributed to genexpower.com.au.

Source: genexpower.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · genexpower.com.au
Source published: Not recordedObserved: 2026-10-17

genexpower.com.au
Attributed to genexpower.com.au

Technical record · 50 MW/100 MWh large-scale battery energy storage project …
Evidence location
/html/body/div/div[1]/div[2]/div[2]/div[1]/div/div/div[5]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
14bf2b3c-3eca-46f4-abe4-4fd62689db45
Evidence reference
6ce676cc-3f1a-4fc4-ad13-930fcd381aa0
Source revision
ebb39777-70e1-4bf7-8853-96086b1c261f
Content fingerprint
3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5
Source address
https://genexpower.com.au/bouldercombe-battery-project/

Current activity

Reported as actual

Described as operational and in full commercial operations from 2H CY2023.

Attributed to genexpower.com.au.

Source: genexpower.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · genexpower.com.au
Source published: Not recordedObserved: 2026-10-17

genexpower.com.au
Attributed to genexpower.com.au

Technical record · Described as operational and in full commercial operations …
Evidence location
/html/body/div/div[1]/div[2]/div[1]/div[1]/div/div/div/div[1]/div/div/div[2]/div/h4
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
159b78dd-762d-4087-bfbb-73098e9e0112
Evidence reference
6bbdaf77-8395-4ce4-b65c-897bbef9e179
Source revision
ebb39777-70e1-4bf7-8853-96086b1c261f
Content fingerprint
3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5
Source address
https://genexpower.com.au/bouldercombe-battery-project/

Location

Source reported

Rockhampton

Attributed to genexpower.com.au.

Source: genexpower.com.au · publication date not recorded · observed 2026-10-17

Sources and evidence · genexpower.com.au
Source published: Not recordedObserved: 2026-10-17

genexpower.com.au
Attributed to genexpower.com.au

Technical record · Rockhampton
Evidence location
/html/body/div/div[1]/div[2]/div[1]/div[1]/div/div/div/div[1]/div/div/div[2]/div/h4
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
d5379669-1772-4ffa-b902-dacc2534f1bc
Evidence reference
6bbdaf77-8395-4ce4-b65c-897bbef9e179
Source revision
ebb39777-70e1-4bf7-8853-96086b1c261f
Content fingerprint
3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5
Source address
https://genexpower.com.au/bouldercombe-battery-project/
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.