Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Free project evidence
Explore projects
Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Earba Storage project, also referred to as the Earba PSH project.
In-depth researchPlanned scope: Proposed scheme with 1,800 MW installed capacity and up to 40,000 MWh of energy storage. Proposed works include adapting the lochs as upper and lower reservoirs, connecting them with an approximately 3 km tunnel, and constructing a powerhouse on Loch Earba’s shore that extends underground, with turbines at the bottom of its shaft for generation and pumping.
Eastern North Dakota Alternate Water Supply Project; the body also refers to it as the Eastern North Dakota Water Supply Project.
In-depth researchPlanned scope: The selected alternative describes infrastructure using existing Garrison Diversion Unit facilities. Phase 1 includes a McClusky Canal intake, pump station, biota water treatment plant, and buried pipelines. Phase 2 includes infrastructure for Missouri River water. The stated capacity language is up to 165 cfs from the McClusky Canal and up to 165 cfs from the Missouri River, with a maximum total combination of 165 cfs.
East Northants Resource Management Facility project
In-depth researchSource-reported scope: The application concerns alteration of existing facilities and construction of new facilities at the East Northants Resource Management Facility, for recovery and disposal of hazardous waste and disposal of low-level radioactive waste. The page classifies the application type as hazardous waste facilities. The number, design and boundaries of the individual facilities are not given in the supplied text.
East Pye Solar
In-depth researchPlanned scope: The project comprises the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) electricity generating station and associated development, including a Battery Energy Storage System (BESS), ancillary infrastructure, customer substations and Grid Connection Infrastructure (including a new National Grid Substation). The project will have a generating capacity of 500MW
Source-reported scope: oil/gas, covering one generating unit (DUB30). The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: geothermal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: nuclear, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
EMILI, associated in the source with Imerys.
In-depth researchPlanned scope: The project is expected to produce 34,000 tonnes of lithium hydroxide annually, described as equivalent to the needs of 700,000 electric vehicles, and to create 170 direct jobs.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: coal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Follow up to five projects free.
A free account keeps your follows and recorded changes alongside later company assessments.
Create free account