Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Free project evidence
Explore projects
Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Visby waterworks upgrades (reconstruction of Visby waterworks).
In-depth researchPlanned scope: At Visby southern waterworks: demolition of existing buildings and extension and new construction of a process hall and distribution building. At Visby northern waterworks: new construction and commissioning of a process building, plus renovation and commissioning of the existing ozone plant.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Whitestone Solar Farm
In-depth researchPlanned scope: A Solar Farm generating station with an estimated capacity of up to 750MW and connecting to the National Grid Brinsworth Substation. The development comprises of solar photovoltaic (PV) modules, an associated Battery Energy Storage System, onsite cabling, a collector substation and satellite substations, and other associated and ancillary development.
Source-reported scope: coal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
ZAC Charenton-Bercy (Charenton-le-Pont)
In-depth researchPlanned scope: The ZAC perimeter is about 20 hectares, with narrower operational works areas. Planned works include reconfiguring rue Baron-Le-Roy within the ZAC and extending it beneath the Paris périphérique, relocating the Bercy 2 shopping centre, constructing a 200 m tower and a new Valmy bridge over the SNCF maintenance site, and building a deck over part of the railway tracks. Parts of the SNCF railway property, the Richelieu co-ownership and gardens, and the Bercy quays are identified as areas without works. The Paris-side continuation of rue Baron-Le-Roy is part of a separate project; the characteristics of the Seine connection remain unspecified.
ZAC Grande Borne Ouest
In-depth researchPlanned scope: The 34-hectare zone includes the Places Hautes and Méridien sectors of Grande Borne, an area extending northeast to the Buffle–Autruche–Pégase school group and Amédée Gordini T12 tram stop, and a mixed housing-and-economic-activity strip between RD 445 and route de Fleury. Planned works include demolishing 414 residential units on the Places Hautes slab and building about 375 new homes, shops and activity space; demolishing the southeast gable of Grand Méridien and its ten homes to extend rue Toussaint Louverture; and remaking public spaces and streets. RD 445 is to be reconfigured as an urban boulevard with two traffic lanes in each direction, a central TZen 4 corridor, bidirectional cycle facilities and planted stormwater swales. The project also refers to rehabilitation of 480 Méridien homes, but the opinion says the dossier does not consistently or comprehensively include rehabilitation and residentialisation of retained buildings; those landlord-led operations are not fully described in the project impact assessment.
Source-reported scope: coal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: coal, covering one generating unit (Unit 1). The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Follow up to five projects free.
A free account keeps your follows and recorded changes alongside later company assessments.
Create free account