Source-reported scope: geothermal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Free project evidence
Explore projects
Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Al Khobar 2 desalination plant
In-depth researchSource-reported scope: Seawater reverse-osmosis desalination (SWRO). The 2023 milestone paragraph reports ramping up production during final testing to a full capacity of 630,000 m³ of potable water per day; another paragraph says daily capacity is more than 630,000 m³ and uses future-tense equipment wording. The source's capacity and status descriptions are therefore inconsistent and do not establish a single unqualified capacity/status.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Almena Unit
In-depth researchSource-reported scope: A multipurpose system consisting of Norton Dam and Keith Sebelius Reservoir (formerly Norton Reservoir), Almena Diversion Dam, the Almena Main and South Canals, laterals, and drains. The general description says the unit serves 5,763 acres. The detailed canal account says the Main Canal serves 3,830 acres and the South Canal 1,520 acres; it also says the lateral system serves 2,450 acres and the remaining 2,900 acres are served by canal turnouts. The detailed service figures total 5,350 acres, not 5,763; the source does not explain the difference. Reported engineering details include a 101-foot-high, 6,450-foot-long Norton Dam; spillway capacity of 94,600 cubic feet per second; outlet capacity of 330 cubic feet per second; and a reservoir capacity of 134,738 acre-feet, allocated among dead storage (2,718), inactive capacity (2,566), irrigation and municipal supply (30,651), and flood control (98,803). The diversion dam is described as an approximately 150-foot-long, 19-foot-high concrete weir with earth dikes. The Main Canal is 20 miles long with 100-cubic-feet-per-second capacity; the South Canal is 8.3 miles long with 36-cubic-feet-per-second capacity. The source also reports 17 laterals totaling 14.3 miles and 6.4 miles of collector drains. Construction milestones reported for these facilities: Norton Dam and Reservoir began in December 1961 and were completed in December 1964; Almena Diversion Dam began in August 1965 and was completed in February 1967; canals, laterals, and drains began in October 1965 and were completed in May 1967. Initial water storage began in October 1964.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: bioenergy, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: geothermal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: bioenergy, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Follow up to five projects free.
A free account keeps your follows and recorded changes alongside later company assessments.
Create free account