CEF Brașov (Centrală Fotovoltaică / photovoltaic power plant).

Romania · Energy

In-depth research Release 1

Project scope

Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.

Reported status and procurement

Reported development

Listed as “În implementare” (in implementation).

Procurement availability
Unknown / not established

Reported procurement

The source reports a signed supply contract no. 161 dated 16.09.2026 with ASTRONERGY SOLAR MODULES B.V. for 51,678 photovoltaic panels and 88 inverters; delivery is stated as DDP at the site within 60 and 90 days of signing, respectively. Separately, the page labels the steel-structure supply and relaunched photovoltaic-park construction procedures as active, listing offer deadlines of 13.08.2026, 12:00 and 16.10.2026, 12:00, respectively. The earlier construction procedure was annulled after errors were identified in its specifications.

Reported financing

Financing contract no. 1170, dated 23.06.2025, is listed.

A source report alone does not establish current progress or an open buying window.

Project summary

CEF Brașov is a photovoltaic facility at Calea Feldioarei FN in Brașov Municipality, Brașov County. Its stated installed capacity is 30.80 MW, and the source lists the project as in implementation; the listed capacity does not establish commissioning. The reported total project value is 140,979,465.45 lei including VAT, with 11,461,470.64 lei shown as financed from the Modernisation Fund. The source reports a signed contract for panels and inverters. It also labels steel-structure supply and relaunched construction procedures active, with offer deadlines of 13 August 2026 and 16 October 2026, respectively. The earlier construction procedure was annulled after errors were identified in its specifications.

Evidence limits and unknowns

Commissioning and achieved operating capacity are not established; the source lists the project as in implementation.

The outcome and current availability of the steel-structure and relaunched construction procedures are not established by the supplied text. It lists offer deadlines of 13.08.2026 and 16.10.2026, respectively.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Romania
Based on reviewed release evidence
Region
Europe
Category
Energy
Derived from released evidence
Physical assets
Solar PV

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

CEF Brașov (Centrală Fotovoltaică / photovoltaic power plant).

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · CEF Brașov (Centrală Fotovoltaică / photovoltaic power plant).
Evidence location
/html/head/title
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e288958a-43bf-4b7f-bb1d-d826988bdb89
Evidence reference
818d0b48-ff71-4381-9430-9b4ca9bca05e
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/

Scope

Source reported

Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · Photovoltaic facility with stated installed capacity of 30.80 …
Evidence location
/html/body/main/section[2]/div/dl
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
27ee1eee-8baf-4805-b21e-b58850dcb774
Evidence reference
abe42ac4-5bd7-470a-91c6-9f14bb46494b
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/

Sector

Source reported

Solar photovoltaic power generation.

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · Solar photovoltaic power generation.
Evidence location
/html/body/main/section[2]/div/dl
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a59a57eb-a07a-4c12-8b81-e9e285afc475
Evidence reference
abe42ac4-5bd7-470a-91c6-9f14bb46494b
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/

Current activity

Source reported

Listed as “În implementare” (in implementation).

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · Listed as “În implementare” (in implementation).
Evidence location
/html/body/main/section[2]/div/dl
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
362a6097-f44d-4a52-8b49-4b095b81336a
Evidence reference
abe42ac4-5bd7-470a-91c6-9f14bb46494b
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/

Location

Source reported

Calea Feldioarei FN, Brașov Municipality, Brașov County.

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · Calea Feldioarei FN, Brașov Municipality, Brașov County.
Evidence location
/html/body/main/section[2]/div/div/span/text-position:54
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
34d10acf-cc38-4b66-870f-11621ce557f1
Evidence reference
c1887be7-f267-4aec-b610-e0cc0ab185f7
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/

Procurement

Source reported

The source reports a signed supply contract no. 161 dated 16.09.2026 with ASTRONERGY SOLAR MODULES B.V. for 51,678 photovoltaic panels and 88 inverters; delivery is stated as DDP at the site within 60 and 90 days of signing, respectively. Separately, the page labels the steel-structure supply and relaunched photovoltaic-park construction procedures as active, listing offer deadlines of 13.08.2026, 12:00 and 16.10.2026, 12:00, respectively. The earlier construction procedure was annulled after errors were identified in its specifications.

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · The source reports a signed supply contract no. …
Evidence location
/html/body/main/section[5]/div/div[1]/div/h2
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
2faf7544-b845-491c-8557-08a5d282f778
Evidence reference
86f5c64b-888b-4b6a-9e80-66371eaab041
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/

Source programme

Source reported

Modernisation Fund (Fondul pentru Modernizare).

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · Modernisation Fund (Fondul pentru Modernizare).
Evidence location
/html/body/main/section[1]/div/div[1]/span/text-position:8
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
1ab3e95c-2bc5-4f35-899b-4c1f1231ce5f
Evidence reference
8063a049-4e72-45c3-9495-4fc79f9f8be7
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/

Financing stage

Source reported

Financing contract no. 1170, dated 23.06.2025, is listed.

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · Financing contract no. 1170, dated 23.06.2025, is listed.
Evidence location
/html/body/main/section[1]/div/div[2]/div[1]/div[2]/div[3]/span/text-position:26
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
a6dc88b8-1b13-473d-81c2-da8c65da2e08
Evidence reference
db9178d8-19a1-4f40-ab21-8a9f4fb1c1e9
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/

Financing amount

Source reported

Total project value: 140,979,465.45 lei including VAT. The amount shown as financed from the Modernisation Fund is 11,461,470.64 lei; the source also states that 8.12% of total investment is co-financed through the fund.

Attributed to www.brasovrenewables.ro.

Source: www.brasovrenewables.ro · publication date not recorded · observed 2026-10-18

Sources and evidence · www.brasovrenewables.ro
Source published: Not recordedObserved: 2026-10-18

www.brasovrenewables.ro
Attributed to www.brasovrenewables.ro

Technical record · Total project value: 140,979,465.45 lei including VAT. The …
Evidence location
/html/body/main/section[1]/div/div[2]/div[1]/div[1]/text-position:13
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
5e9d44da-b2b4-42bc-b61f-62582f6a340e
Evidence reference
ae07d635-7c50-4534-b9ed-eed438982267
Source revision
460c7286-9f22-4d70-8b65-c6de2c3f9e29
Content fingerprint
adef92ad51c5a50eca7f3607fb770591ca4ab1f318324bfe38781c7497bf666c
Source address
https://www.brasovrenewables.ro/
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.