Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name.

India · Energy

In-depth research Release 1

Project scope

Plan: 500 MW hydro pumped-storage project (PSP).

Reported status and procurement

Reported development

The source says its five hydro-pumped-storage projects are progressing as planned and identifies this as the first 500 MW PSP on the Chitravathi River.

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

Adani Green Energy’s Integrated Annual Report 2025-26 describes a 500 MW hydro pumped-storage project on the Chitravathi River in Andhra Pradesh. It identifies the project descriptively, without giving a formal name. The report says its five hydro-PSP projects are progressing as planned and gives a general completion expectation for this project, but no calendar target.

Evidence limits and unknowns

The cited passage does not give a formal project name, a specific completion date, or project-specific procurement details.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
India
Based on reviewed release evidence
Region
Asia
Category
Energy
Derived from released evidence
Physical assets
Pumped Hydro

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Identified in the source descriptively as the first 500 MW pumped-storage project on the Chitravathi River; the source does not provide a formal project name.

Attributed to www.adanigreenenergy.com.

Source: www.adanigreenenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.adanigreenenergy.com
Source published: Not recordedObserved: 2026-10-17

www.adanigreenenergy.com
Attributed to www.adanigreenenergy.com

Technical record · Identified in the source descriptively as the first …
Evidence location
/html/body/div/section[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
93147b3a-963f-49d9-baa0-7aa203eeddbe
Evidence reference
03bbb885-e800-43c0-a362-0b1b4f0dd83e
Source revision
4e74489c-58f8-4b80-9a1a-b3c1233f7f1f
Content fingerprint
aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d
Source address
https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html

Scope

Planned

500 MW hydro pumped-storage project (PSP).

Attributed to www.adanigreenenergy.com.

Source: www.adanigreenenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.adanigreenenergy.com
Source published: Not recordedObserved: 2026-10-17

www.adanigreenenergy.com
Attributed to www.adanigreenenergy.com

Technical record · 500 MW hydro pumped-storage project (PSP).
Evidence location
/html/body/div/section[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e930367b-7d86-4238-8a6d-c67078ce8645
Evidence reference
03bbb885-e800-43c0-a362-0b1b4f0dd83e
Source revision
4e74489c-58f8-4b80-9a1a-b3c1233f7f1f
Content fingerprint
aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d
Source address
https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html

Current activity

Source reported

The source says its five hydro-pumped-storage projects are progressing as planned and identifies this as the first 500 MW PSP on the Chitravathi River.

Attributed to www.adanigreenenergy.com.

Source: www.adanigreenenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.adanigreenenergy.com
Source published: Not recordedObserved: 2026-10-17

www.adanigreenenergy.com
Attributed to www.adanigreenenergy.com

Technical record · The source says its five hydro-pumped-storage projects are …
Evidence location
/html/body/div/section[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
3cd65af9-e8d3-43a9-b3eb-46d4339e8f4e
Evidence reference
03bbb885-e800-43c0-a362-0b1b4f0dd83e
Source revision
4e74489c-58f8-4b80-9a1a-b3c1233f7f1f
Content fingerprint
aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d
Source address
https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html

Location

Source reported

Chitravathi River, Andhra Pradesh.

Attributed to www.adanigreenenergy.com.

Source: www.adanigreenenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.adanigreenenergy.com
Source published: Not recordedObserved: 2026-10-17

www.adanigreenenergy.com
Attributed to www.adanigreenenergy.com

Technical record · Chitravathi River, Andhra Pradesh.
Evidence location
/html/body/div/section[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
fe73bf3e-4b39-4e5b-bfe0-d8f6be31d171
Evidence reference
03bbb885-e800-43c0-a362-0b1b4f0dd83e
Source revision
4e74489c-58f8-4b80-9a1a-b3c1233f7f1f
Content fingerprint
aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d
Source address
https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html

Next milestone

Planned

Expected to be completed in one of the shortest timelines; no specific completion date is given.

Attributed to www.adanigreenenergy.com.

Source: www.adanigreenenergy.com · publication date not recorded · observed 2026-10-17

Sources and evidence · www.adanigreenenergy.com
Source published: Not recordedObserved: 2026-10-17

www.adanigreenenergy.com
Attributed to www.adanigreenenergy.com

Technical record · Expected to be completed in one of the …
Evidence location
/html/body/div/section[2]/div/p[2]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
b8cc4239-35af-43e5-8342-c866a7cc389d
Evidence reference
03bbb885-e800-43c0-a362-0b1b4f0dd83e
Source revision
4e74489c-58f8-4b80-9a1a-b3c1233f7f1f
Content fingerprint
aa244272d092d5a0ee82ac9bd52c6298f2d3bb71c18102650952b2104c34320d
Source address
https://www.adanigreenenergy.com/digital-reports/green-energy/2026/engineering-reliability-into-the-transition.html
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.