A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.
Reported status and procurement
Reported development
The page labels the project “Operando” (operating); it reports that Phase 1 was inaugurated in January 2022, construction concluded in August 2025, and administrative closure followed in September 2025.
Procurement availability
Unknown / not established
A source report alone does not establish current progress or an open buying window.
Project summary
Codelco describes a replacement system with a new primary crushing station at Nodo 3.500 and a 4.8 km ore-conveyor tunnel to Planta Cordillera, intended to maintain the current processing level. The page labels the project operating and reports Phase 1 inaugurated in January 2022; it also states construction concluded in August 2025, followed by administrative closure in September 2025.
Evidence limits and unknowns
The supplied page capture, observed 2026-10-17, gives no publication date and does not state procurement or tender status, remaining supplier packages, or budget. It identifies Nodo 3.500 and Planta Cordillera but does not give a broader project location.
Is this project a fit for your company?
Check how this project relates to what your company supplies, with evidence gaps and a next step.
Create your account for free and include your business details to get custom commercial assessments.
Project metadata
Country
Chile Based on reviewed release evidence
Region
Latin America Caribbean
Category
Industrial processes Derived from released evidence
Physical assets
Not classified
Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.
Released facts and supporting evidence
Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.
Project name
Source reported
Nuevo Sistema Traspaso Andina
Attributed to www.codelco.com.
Source: www.codelco.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.codelco.com
Source published: Not recordedObserved: 2026-10-17
A structural project described as replacing the existing primary crushing and ore-transport system because of a change in pit orientation. Scope includes a new primary crushing station and associated infrastructure at Nodo 3.500, plus a 4.8 km ore-conveyor tunnel to the existing concentrator at Planta Cordillera; the stated objective is to maintain the current processing level.
Attributed to www.codelco.com.
Source: www.codelco.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.codelco.com
Source published: Not recordedObserved: 2026-10-17
The page labels the project “Operando” (operating); it reports that Phase 1 was inaugurated in January 2022, construction concluded in August 2025, and administrative closure followed in September 2025.
Attributed to www.codelco.com.
Source: www.codelco.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.codelco.com
Source published: Not recordedObserved: 2026-10-17
The source identifies the sector Nodo 3.500 and Planta Cordillera, the existing concentrator reached by the described transport system; it does not state a broader project location.
Attributed to www.codelco.com.
Source: www.codelco.com · publication date not recorded · observed 2026-10-17
Sources and evidence · www.codelco.com
Source published: Not recordedObserved: 2026-10-17
Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.
No material timeline events have been released.
Follow this project
Get project updates by email when new information is published.
Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.
DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.