Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Petrobrazi refinery photovoltaic project

Romania · Energy

In-depth research Release 1

Project scope

Plan: A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m² within the refinery and supplying renewable electricity for the refinery’s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery’s electrical infrastructure, including connection to its internal grid.

Reported status and procurement

Reported development
Not established
Procurement availability
Unknown / not established

Reported procurement

The Procurement, Construction and Commissioning contract was reported as awarded. The source does not identify the contractor.

A source report alone does not establish current progress or an open buying window.

Project summary

OMV Petrom’s announcement dated 13 February 2026 describes a planned photovoltaic park within the Petrobrazi refinery site, with approximately 7 MW of installed capacity and an intended role supplying the refinery’s internal electricity use. The reported budget is up to RON 45.4 million including VAT, with RON 8.4 million stated as provided through the Modernization Fund. The Procurement, Construction and Commissioning contract was reported as awarded; the announcement expected construction to start in the following period and finish during 2026. These are source-dated plans, not confirmation of current project progress or completion.

Evidence limits and unknowns

The source does not specify a city or country, detailed equipment specifications, or the awarded contractor.

The announcement does not confirm whether the stated construction schedule was achieved or whether any supplier scope remains available.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
Romania
Based on reviewed release evidence
Region
Europe
Category
Energy
Derived from released evidence
Physical assets
Solar PV

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Date

Source reported

The announcement is dated 13 February 2026.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · The announcement is dated 13 February 2026.
Evidence location
/html/body/main/section[2]/div/div/div[1]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
9689d10f-3016-4c16-a492-6341550a377d
Evidence reference
649e9366-18cf-4f8e-b74f-8eaf93daafd9
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Project name

Source reported

Petrobrazi refinery photovoltaic project

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Petrobrazi refinery photovoltaic project
Evidence location
/html/body/main/section[1]/div/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
7232c5ee-3bd2-4faa-ba78-9a2563dc0bc7
Evidence reference
8fcf01c0-1676-4677-9164-90d11a6c3b00
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Scope

Planned

A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m² within the refinery and supplying renewable electricity for the refinery’s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery’s electrical infrastructure, including connection to its internal grid.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · A planned photovoltaic park with approximately 7 MW …
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
9a83ea6d-ad33-492c-83a3-69c536a07818
Evidence reference
da21717a-603b-472d-b32c-0eff508b15b3
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Sector

Planned

Renewable electricity generation for refinery self-consumption.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Renewable electricity generation for refinery self-consumption.
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/ul/li[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
00c257a8-858a-406a-bba0-44683601eadd
Evidence reference
da21717a-603b-472d-b32c-0eff508b15b3
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Funding

Source reported

The project is co-financed through the Modernization Fund.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · The project is co-financed through the Modernization Fund.
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/ul/li[3]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
4d25add6-de0c-4144-832b-0f286bcf264b
Evidence reference
9a8d204f-618a-4db9-a180-8c886223fd19
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Location

Source reported

Within the Petrobrazi refinery site; the source does not specify a city or country.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Within the Petrobrazi refinery site; the source does …
Evidence location
/html/body/main/section[1]/div/h1
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
68d7e89c-73df-46f8-96f4-8a58485fd89e
Evidence reference
8fcf01c0-1676-4677-9164-90d11a6c3b00
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Operator

Planned

OMV Petrom is to operate the park.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · OMV Petrom is to operate the park.
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[5]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
08f619b3-7980-4931-9de0-1aa437986cd0
Evidence reference
384b8952-ed49-41d3-a539-49249b1c2915
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Developer

Planned

OMV Petrom is to construct the photovoltaic park.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · OMV Petrom is to construct the photovoltaic park.
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
44053a16-adac-4e19-8b6d-8efb750cfd0f
Evidence reference
4f2b56eb-bf3f-446d-9df6-12da804ca40d
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Investment estimate

Source reported

Project budget of up to RON 45.4 million, including VAT.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Project budget of up to RON 45.4 million, …
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[4]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e672ef85-3e05-4717-98f2-a29e745f7d08
Evidence reference
df6ca7b5-943c-4af6-b98d-bf7a189d2f81
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Procurement

Source reported

The Procurement, Construction and Commissioning contract was reported as awarded. The source does not identify the contractor.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · The Procurement, Construction and Commissioning contract was reported …
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[5]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
46f5bd77-ea6e-4146-b6a7-42ad8c147380
Evidence reference
384b8952-ed49-41d3-a539-49249b1c2915
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Next milestone

Planned

Construction was expected to start in the period following the announcement and be completed during 2026.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · Construction was expected to start in the period …
Evidence location
/html/body/main/section[2]/div/div/div[1]/div/p[1]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
42383eef-c415-42f4-903e-7fab484e9120
Evidence reference
649e9366-18cf-4f8e-b74f-8eaf93daafd9
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi

Financing amount

Source reported

RON 8.4 million is stated as provided through the Modernization Fund.

Attributed to www.omvpetrom.com.

Source: www.omvpetrom.com · publication date not recorded · observed 2026-10-18

Sources and evidence · www.omvpetrom.com
Source published: Not recordedObserved: 2026-10-18

www.omvpetrom.com
Attributed to www.omvpetrom.com

Technical record · RON 8.4 million is stated as provided through …
Evidence location
/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[4]
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
2b138db0-04ba-4bbd-90ed-e2adf17b2258
Evidence reference
df6ca7b5-943c-4af6-b98d-bf7a189d2f81
Source revision
83465a27-c146-4779-a5e7-761859d9cd5c
Content fingerprint
6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb
Source address
https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.