Plan: Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.
Reported status and procurement
Reported development
Not established
Procurement availability
Unknown / not established
A source report alone does not establish current progress or an open buying window.
Project summary
AQUIND Interconnector is described as a planned 2,000 MW connection between Great Britain and France, offshore Portsmouth and onshore between Portsmouth and Lovedean substation. The stated route runs from the UK seaward limit in the English Channel to Lovedean Substation. The supplied project-page text labels the project as at the decision stage; that statement is undated. Evidence observation is recorded as 1 October 2026; this is not the date of the stage statement.
Evidence limits and unknowns
The supplied evidence is the registered native project-page paragraph representation, not a whole-document review. Email-containing and link-only paragraphs were excluded; linked documents and graphical content were not reviewed.
Later project progress and purchasing availability are not established by the supplied evidence.
Procurement status, contractor, budget, financing and specific equipment-package needs are not established by the supplied project-page paragraphs.
Is this project a fit for your company?
Check how this project relates to what your company supplies, with evidence gaps and a next step.
Create your account for free and include your business details to get custom commercial assessments.
Project metadata
Country
France, United Kingdom Based on reviewed release evidence
Region
Europe
Category
Energy Derived from released evidence
Physical assets
Electricity Transmission
Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.
Released facts and supporting evidence
Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.
Project name
Source reported
AQUIND Interconnector
Attributed to Planning Inspectorate.
Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01
Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01
Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.
Attributed to Planning Inspectorate.
Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01
Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01
Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.
No material timeline events have been released.
Follow this project
Get project updates by email when new information is published.
Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.
DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.