Skip to content
Menu
CapexCue · Public evidence · Printed 11 Nov 2026
Explore projects / Project dossier

Botley West Solar Farm

United Kingdom · Energy

In-depth research Release 1

Project scope

Plan: Solar photovoltaic array and connection infrastructure, with a maximum intended generation capacity of 840MW.

Reported status and procurement

Reported development

This project is at the decision stage. The date set for this to be completed is 10 November 2026

Procurement availability
Unknown / not established

A source report alone does not establish current progress or an open buying window.

Project summary

Botley West Solar Farm is a planned solar photovoltaic array and connection project, with a maximum intended generation capacity of 840MW, across approximately 1,400 hectares in West Oxfordshire, Cherwell and Vale of White Horse districts. The project information observed on 1 October 2026 reported it at the decision stage, with completion set for 10 November 2026. This does not establish that a decision has been made or that construction has begun.

Evidence limits and unknowns

Only the supplied project-information text was reviewed; this was not a review of the complete source document.

Email-containing and link-only paragraphs, linked documents and graphical content were not reviewed.

Later project progress and procurement availability are not established.

Is this project a fit for your company?

Check how this project relates to what your company supplies, with evidence gaps and a next step.

Create your account for free and include your business details to get custom commercial assessments.

Project metadata

Country
United Kingdom
Based on reviewed release evidence
Region
Europe
Category
Energy
Derived from released evidence
Physical assets
Solar PV

Based on this release's supporting evidence. Unresolved fields remain unclassified; these labels do not establish current progress or a buying window.

Released facts and supporting evidence

Each fact retains its source, uncertainty and time context. If a publisher page moves or is unavailable, use the recorded quotation and observation date below.

Project name

Source reported

Botley West Solar Farm

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · Botley West Solar Farm
Evidence location
native-name-name
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
d5c0a908-1775-43a7-a326-21d6740e4deb
Evidence reference
c1343e5a-d8f1-4008-93ed-ae057432ed56
Source revision
62f40e31-064d-4c9a-b25f-33cd7040cde2
Content fingerprint
282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147

Scope

Planned

Solar photovoltaic array and connection infrastructure, with a maximum intended generation capacity of 840MW.

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · Solar photovoltaic array and connection infrastructure, with a …
Evidence location
native-scope-scope
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
94a4449d-3127-462f-ae46-1c31841faf99
Evidence reference
9dbf864b-e085-4a6f-83b8-76086b6af795
Source revision
62f40e31-064d-4c9a-b25f-33cd7040cde2
Content fingerprint
282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147

Delivery

Source reported

This project is at the decision stage. The date set for this to be completed is 10 November 2026

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · This project is at the decision stage. The …
Evidence location
native-delivery-adverse_context
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
e7a4fc65-c333-4a70-a320-d986da0b149a
Evidence reference
2b8da7f7-e813-4af2-8d9d-e2435d3ae50f
Source revision
62f40e31-064d-4c9a-b25f-33cd7040cde2
Content fingerprint
282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147

Location

Source reported

Land in West Oxfordshire, Cherwell and Vale of White Horse Districts, across approx 1400 hectares

Attributed to Planning Inspectorate.

Source: Planning Inspectorate · publication date not recorded · observed 2026-10-01

Sources and evidence · Planning Inspectorate
Source published: Not recordedObserved: 2026-10-01

Planning Inspectorate
Attributed to Planning Inspectorate

Technical record · Land in West Oxfordshire, Cherwell and Vale of …
Evidence location
native-location-location
Claim confidence
0.90 on a 0–1 evidence-support scaleNot a probability of project success or procurement availability.
Claim reference
8318893b-81c4-4120-9bc3-795884e4e770
Evidence reference
198887ac-3df3-4cf5-8ed2-a012b5e8af29
Source revision
62f40e31-064d-4c9a-b25f-33cd7040cde2
Content fingerprint
282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc
Source address
https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147
Source report history

Prior and superseded states remain labelled. Dates below identify source publication when known, otherwise source observation. They are not assumed event dates; each fact retains its own time qualifications.

  1. No material timeline events have been released.

Follow this project

Get project updates by email when new information is published.

Follow for free without an account, with the option to unsubscribe anytime. We'll email you a link to confirm.

DEEPRFP, S.L.U. uses your email and selected project to confirm and deliver the updates you request. You can stop anytime. Product news needs a separate opt-in. Read the Privacy Policy for legal bases, recipients, retention, your rights and contact details.