Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Free project evidence
Explore projects
Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Canyon Ferry Unit, part of the Pick-Sloan Missouri Basin Program.
In-depth researchSource-reported scope: The unit’s principal structures are Canyon Ferry Dam and Powerplant, with Canyon Ferry Reservoir. The source describes a concrete gravity dam about 1,000 feet long along its crest and 225 feet high, with a central spillway controlled by four radial gates, four river outlets, a pumping intake for the Helena Valley Pumping Plant, and three penstocks. The downstream-toe powerplant houses three vertical-shaft generators. The same unit page also describes upper-lake waterfowl-enhancement works, including a dike system and habitat facilities.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
CEF Brașov (Centrală Fotovoltaică / photovoltaic power plant).
In-depth researchSource-reported scope: Photovoltaic facility with stated installed capacity of 30.80 MW; this figure does not establish that the capacity is commissioned.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Central Valley Project (CVP).
In-depth researchSource-reported scope: A multipurpose, interconnected system of dams, reservoirs, powerplants, canals, conduits, tunnels, and related facilities organized into interrelated divisions and units. The source counts 20 dams and reservoirs, 11 powerplants, and 500 miles of major canals, and describes a reach of about 400 miles. Separately, it says project plans encompassed 35 counties over an area about 500 miles long and 60 to 100 miles wide; these are distinct geographic descriptions that the page does not reconcile. Auburn Dam was intended to be the CVP's largest dam but is described as incomplete and in limbo, not as a completed facility. The CVP shares conveyance and coordinated operations with the State Water Project (SWP), but the source distinguishes the CVP from the SWP and from local water-rights infrastructure.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Follow up to five projects free.
A free account keeps your follows and recorded changes alongside later company assessments.
Create free account