Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Free project evidence
Explore projects
Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: geothermal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
New surface-water treatment plant at Långasjön, referred to here as the Karlshamn water treatment plant.
In-depth researchPlanned scope: Construction of a new surface-water treatment plant supplied with raw water from Långasjön and reserve water from Mörrumsån; includes an intake station, primarily involving renovation of an existing facility.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: coal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
North Irish Sea Array (NISA)
In-depth researchPlanned scope: Proposed offshore wind farm with two planning layout options: 35 wind turbine generators (WTGs) with maximum tip height 316 m, or 49 WTGs with maximum tip height 290 m. Offshore infrastructure includes inter-array cables, an offshore substation platform and an export cable corridor. The proposed foundation refinement removes monopiles in favour of jackets with suction buckets. Onshore infrastructure includes a grid facility west of the R132 and a proposed cable route around north Balbriggan, under the M1, to the grid connection point at Belcamp Substation.
Source-reported scope: coal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Nobles Energy Storage Project, also described as the Nobles Battery Energy Storage System Project.
In-depth researchPlanned scope: Proposed battery energy storage system rated up to 300 MW and approximately 1,200 MWh; the project summary describes up to 300 MW for four continuous hours and a 300 MW Generator Interconnection Agreement with MISO. The project description says it will primarily use lithium iron phosphate (LFP); the summary says LFP was selected, while final technology and equipment specifications remain to be determined during procurement and final engineering. Preliminary design includes approximately 260 battery units, 65 medium-voltage transformers, two main power transformers, inverters, electrical feeder lines, a substation, and an approximately 1,300-foot 115-kV generation interconnection line. The site encompasses approximately 154 acres; approximately 31 acres are designated for preliminary development, including a temporary two-acre laydown yard to be restored after construction, and the permanent operational footprint is approximately 29 acres. Areas outside the designated development footprint are to remain undisturbed.
Source-reported scope: bioenergy, covering one generating unit (Nongkhaem II). The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: bioenergy, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: bioenergy, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Northwich Flood Risk Management Scheme
In-depth researchSource-reported scope: A flood-defence scheme reported to protect around 400 homes and businesses. The described measures include floodgates and lightweight-aluminium temporary barriers; at Dane Bridge, a double layer of barriers forms a channel to keep the River Dane contained and prevent water escaping toward London Road or Watling Street. The source also cautions that flooding cannot be entirely ruled out.
Source-reported scope: coal, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Nya vattenverket (Pireva’s new waterworks).
In-depth researchPlanned scope: Planned new drinking-water treatment plant beside the existing Degeränget works; proposed treatment includes ultrafilter, ozone and carbon filtration. The existing facilities are planned for demolition once the new plant is complete.
Oakland TraPac electric crane phase: four new ship-to-shore cranes at TraPac’s Oakland terminal.
In-depth researchSource-reported scope: Four new 100%-electric Liebherr ship-to-shore cranes, manufactured in Ireland; each is reported as 440+ feet tall, designed to reach 24 container rows and work stacks up to 11 containers high. Two were reported in service/fully operational; the other two were under construction or assembly and expected to be operational in Fall 2026.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Follow up to five projects free.
A free account keeps your follows and recorded changes alongside later company assessments.
Create free account