Sizewell C
In-depth researchPlanned scope: Construction of a new nuclear power plant intended to deliver clean power.
Free project evidence
Search by scope, place or organization, then check the dated evidence before deciding what's worth pursuing.
Planned scope: Construction of a new nuclear power plant intended to deliver clean power.
Source-reported scope: Battery energy storage facility rated at 65 MW / 130 MWh; 65 MW installed capacity and two-hour storage duration.
Source-reported scope: bioenergy, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: wind, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Planned scope: The shared connection includes an offshore electrical substation, three submarine links over 45 km to the landing at Erdeven, and three underground land links over 26 km to the onshore substation at Pluvigner. The offshore substation is described as 70 m square, 30 m above and 90 m below the sea surface. The submarine links are to be buried 0.3–2.5 m deep; on land, the links use trenches 0.5–0.7 m wide and about 1 m deep. The Pluvigner substation occupies 8.4 ha, with four 28 m pylons connecting it to the electricity network.
Source-reported scope: Construction of a new Engineering, Computing and General Teaching building; listed size 12,800 m².
The planned RN 12 southern bypass of Ernée includes 3.6 km of new alignment west of town and 1.4 km of RD 31 requalification east of town. The bidirectional 5 km road includes an Ernée valley viaduct, cycle-route sections and road-runoff treatment basins.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: bioenergy, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Planned scope: The project comprises the construction and operation of the Stallingborough CCGT generating plant and CCP which is anticipated to generate approximately 900 megawatts of electricity. Natural gas will be transported to the Main Site by a pipeline from the Ulceby and Habrough area in an easterly direction. Electricity will be supplied from the Main Site into the grid by a new electrical connection leading in a southerly direction to the existing West Grimsby substation. The Stallingborough CCGT generating plant and CCP is located within land owned by the Applicant’s Group, whereas the route for the natural gas pipeline and electricity connection, which is owned by a number of third parties, will be determined as part of the route selection and iterative environmental impact assessment processes. The potential cooling water infrastructure would be located within the Humber estuary where the foreshore is owned by the Crown Estate and the potential laydown area at the RWE CHP Grimsby site is under RWE ownership.The Main Site will be fitted with carbon capture equipment and carbon dioxide will be transported to offshore geological storage under the north sea and this transport and storage is expected to utilise the separate Viking CCS pipeline (PINS case reference EN070008). A connection between the Main Site and the Viking CCS pipeline will be delivered as a part of a separate project and consenting process.
Planned scope: Planned 324-unit battery energy storage system using Tesla Megapack units, described as 300 MW with four-hour duration (1,200 MWh).
Source-reported scope: Star Garments’ infrastructure at the PIA, described as a new production unit; the article identifies the project as textile.
Source-reported scope: oil/gas, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Planned scope: The proposed action is rehabilitation of Stigler Lake Dam and an associated raw-water pipeline for the Stigler Water Treatment Plant during dam construction. The FONSI describes connecting an existing waterline to the plant, and also describes a new pipeline segment running from an existing raw-water pipeline to the plant. It does not further clarify the precise configuration of that connection.
Source-reported scope: Solar PV independent power project. Capacity is listed as 1,500 MW; the description says the plant is poised to become a major single-contracted solar PV plant, with installed capacity of approximately 1,500 MW. Technology is reported as bifacial panels with tracking and automated robotic cleaning. The source does not establish commissioning or operating status.
Source-reported scope: nuclear, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: Battery energy storage system rated at 240 MWac / 960 MWh.
Planned scope: A proposal to construct a new bridge over the Pecos River just downstream of Sumner Dam and realign NM 203 traffic away from the dam crest and spillway bridge. The source says studies concluded that using the existing alignment for a new bridge was not feasible; it does not report construction of the proposed bridge.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: oil/gas, covering one generating unit (CC1). The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: coal, covering one generating unit (Unit 1). The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.
Source-reported scope: hydropower, covering one generating unit. The source is the August 2026 dataset. Current status, greenfield/replacement context and buying availability have not been rechecked.